Forebay Volatile Organic Compounds (VOC) Project

2 Documents in Project

Summary

SCH Number
2001061105
Lead Agency
Orange County Water District
Document Title
Forebay Volatile Organic Compounds (VOC) Project
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2001
Present Land Use
EW-1: Paved Parking Lot/C-L, Limited Commercial/General Commercial EW-2: Paved Parking Lot/M-P 200,000 Industrial Park/Industrial
Document Description
Two systems to treat chlorinated VOCs in the forebay of the Orange County groundwater basin would be constructed. Both systems would be constructed in existing parking lots of industrial/commercial complexes. Each system would include the following components: (1) an extraction well; (2) an advanced oxidation (AO) treatment system; (3) a residual treatment system (a liquid-phase granular activated carbon (LGAC) treatment system and/or an air stripping system; and (4) an injection well. Each system would be modular and would be constructed and operated on an approximately 1,500-square-foot concrete pad.

Contact Information

Name
Adam Hutchinson
Agency Name
Orange County Water District
Contact Types
Lead/Public Agency

Location

Cities
Anaheim, Fullerton
Counties
Orange
Cross Streets
Orangethorpe & Lemon / Valencia & Acacia
Total Acres
0.07
Parcel #
unknown
State Highways
91 & 57
Railways
BNSF & Metrolink
Schools
Commonwealth Elementary
Waterways
Fullerton Creek & Carbon Creek
Township
35
Range
10W
Section
34/35
Base
SBB&M

Notice of Determination

Approving Agency
Orange County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print