East Linda Vista Trunk Sewer Phase II

3 Documents in Project

Summary

SCH Number
2001061055
Lead Agency
City of San Diego
Document Title
East Linda Vista Trunk Sewer Phase II
Document Type
NOD - Notice of Determination
Received
Posted
3/1/2002
Document Description
City Council approval of Capital Improvement Project No. 461621 for the abandonment of approximatley 5,450 linear feet of existing 18-inch diameter sewer main, laterals and manholes, the realignment and open-trench installation of approximately 4,800 linear feet of new 8-inch diameter sewer mains, laterals, and manholes, and the rehabilitation/upgrade of approximately 3,250 linear feet of existing 18-inch diameter sewer main and manholes utilizing trenchless pipe-burst and slip-lining technologies. In addition, approximately 398 linear feet of existing 6-inch and 368 linear feet of existing 4-inch cast iron water pipe would be replaced with a new 8-inch water pipe. New sewer main installation will include improvements to service connections, restoration of concrete pavement, pedesrian ramps, slurry seal, restriping and related improvements.

Contact Information

Name
Jeff Winters-Thomas
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Mulitple streets including Kramer Street, Volta Street, Westing House etc.
State Highways
8,163,805
Schools
Kit Carson, Linda Vista, Holy Family, Montgomery, Chesterton
Waterways
San Diego River
Township
16S
Range
3W
Base
LaJolla
Other Location Info
Linda Vista

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print