CIP Project #00-63, Arroyo Mocho Multi-Use Trail Extension

2 Documents in Project

Summary

SCH Number
2001032039
Lead Agency
City of Livermore
Document Title
CIP Project #00-63, Arroyo Mocho Multi-Use Trail Extension
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2007
Present Land Use
Zoning: E (Education and Institutions); and OS-F (Open Space-Flood) General Plan: Osprot (Parks, Trails, Recreation Corridors and Protected Areas)
Document Description
The City of Livermore proposes to extend the existing Arroyo Mocho Trail that lies within Robertson Park, from where it ends on the north side of the park, east to the Wente Street/Concannon Boulevard undercrossing. The proposed trail extension would direct pedestrian traffic to a single trail, and minimize use of the existing informal trails. The proposed extension would be approximately 1,907 feet in length. The majority of the path and associated grading would be about 10 feet wide with the exception of an approximately 160-foot length that would be 25 feet wide approximately 200 feet east of the western project boundary and a 260-foot length where the graded cross section will be 15 feet wide in the center of the project area.

Contact Information

Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Livermore
Counties
Alameda
Cross Streets
South Livermore Avenue Wente Street
Zip
94550
Total Acres
1,700
Parcel #
099-0750-017-09
Schools
CUR Savior Lutheran Private School
Waterways
Arroyo Mocho Creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print