Notification # 1600-2011-0144-R2 Farad Diversion Dam Replacement Project
6 Documents in Project
Summary
SCH Number
2000042074
Lead Agency
State Water Resources Control Board
Document Title
Notification # 1600-2011-0144-R2 Farad Diversion Dam Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/5/2014
Document Description
The California Department of Fish and Wildlife is executing Lake or Streambed Alteration Agreement number 1600-2011-0144-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, NV Energy.
The project is limited to reconstruction of the Farad Diversion Dam and restoration of power generation from the 2.6 megawatt Farad Power Plant. The original Farad Diversion Dam was destroyed in a flood in January 1997. The proposed project includes the following components: 1) temporary water diversion, including mechanically stabilized earth wall; 2) temporary river crossing (bridge); 3) access road (river left) and portage trail (river right); 4) diversion structure, including roughened channels for fish passage and a boat/debris chute; 5) intake box structure and diversion conduit; 6) sediment detention channel with fish screen; 7) fish return and outfall; 8)flume reconstruction; 9) Old Highway 49 drainage improvements and 10) native plant vegetation. Bank and bed stabilization including mechanically stabilized earth walls, pre-formed grouted concrete, boulder boxes, and other stabilized materials will be installed to ensure the new facility can withstand a 100-year flood. Total construction area is about 7 acres.
Contact Information
Name
Julie Newman
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Floriston
Counties
Nevada
Cross Streets
Highway 80 and the Floristan exit
State Highways
80
Railways
Union Pacific
Waterways
Truckee River
Township
18N
Range
18E
Section
30
Base
MDBM
Other Location Info
Floriston
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes