Shake Ridge/Ono Ranch Shaded Fuel Break

4 Documents in Project

Summary

SCH Number
1998102004
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Shake Ridge/Ono Ranch Shaded Fuel Break
Document Type
NOD - Notice of Determination
Received
Posted
11/30/2000
Document Description
This project will construct a portion of a shaded fuel break along Shake Ridge Road in Amador County, ridges east of Highway 88 and Omo Ranch Road in El Dorado County. Within the project area forest floor litter, low growing shrubs, brush, conifer thickers and woody debris will be removed through a series of prescribed burns. The proposed fuel break will aid in fire suppression efforts in the event of a wildland fire. Fire intensity and crown fire potential is reduced, the effectiveness of air and ground attack forces is enhanced, safety for fire suppression personnel is increased and success for controlling high intensity wildland fires is increased. The strategy is to control fires quickly, keep the size of the fire small and reduce the damage a large conflagration-type fire will have on watersheds, wildlife habitat and structures. The project will be conducted under CDF's Vegetation Management Program which incorporates environmental reviews, standard best management practices and appropriate mitigation measures to ensure that any potential adverse environmental impacts are totally avoided or minimized to less than significant.

Contact Information

Name
Tom Larsen
Agency Name
Forestry and Fire Protection Department
Contact Types
Lead/Public Agency

Location

Counties
Amador
Cross Streets
Pine Grove, Omo Ranch, Devils Nose, and Caldor
State Highways
88
Waterways
South Fork Consumnes River and Antelope Creek
Township
8N
Range
13,14E
Section
13,25
Base
MDBM
Other Information
section: 33-36;17-21,30,31,1-4,9-12,14

Notice of Determination

Approving Agency
Thomas Larsen
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print