Santa Ana River Mainstream Project for the Prado Dam
23 Documents in Project
Summary
SCH Number
1997071087
Lead Agency
United States Army, Army Corps of Engineers
(USACE)
Document Title
Santa Ana River Mainstream Project for the Prado Dam
Document Type
NOD - Notice of Determination
Received
Posted
10/15/2009
Document Description
The Applicant proposes to alter the stream to construct flood control improvements to provide flood protection to areas susceptible to floods ranging from 100 yr to 190 yr frequencies within Orange, Riverside and San Bernardino Counties. The project features include Norco Bluffs toe stabilization, structural improvements within Prado Dam and Basin, and flood control improvements downstream of Prado Dam in Reach 9 of the Santa Ana River. The project site extends from the area upstream of Prado Basin along the Norco Bluffs through Reach 9 of the Santa Ana River, upstream of Weir Canyon Road. The project has been divided into three components that include component Norco Bluffs (Component A), Prado Basin (Component B), and Reach 9 (Component C). The Norco Bluffs component is located along the southern bank of the Santa Ana River downstream of Interstate 15 and extends for ~1.5 miles. Directly downstream of Component A, the Prado Basin Component encompasses ~9,700 acres surrounding the Santa Ana River, directly northeast of the junction of State Route 91 and State Route 71. The Reach 9 component of the Santa Ana River is located immediately downstream of Prado Dam and extends dor ~7.4 miles to Weir Canyon Road in the City of Anaheim.
Contact Information
Name
Michael D. Flores
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Chino, Corona, Yorba Linda
Counties
San Bernardino
Cross Streets
Pine Street and Euclid Avenue
Total Acres
~60
State Highways
I-15, SR-83, SR-91
Airports
John Wayne
Waterways
Santa Ana River, Pacific Ocean
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.