Santa Paula Creek Sediment Removal Project

4 Documents in Project

Summary

SCH Number
1993114003
Lead Agency
United States Army, Army Corps of Engineers (USACE)
Document Title
Santa Paula Creek Sediment Removal Project
Document Type
ADM - Addendum
Received
Present Land Use
Residential, Commercial and Agricultural
Document Description
NOTE: Addendum EZ / FONSI The Final SEIS/EIR (1995) identified that cleanout would occur, on average, at about 3 to 4 year intervals (varying from 1 to 2 year intervals to up to 10 year intervals). Floods would cover vegetation in the stream with sediment every 3 to 4 years, on average, but this could occur more or less frequently. The footprint of deposited sediment would extend about 1.8 miles. Cleanout would be required after major floods; and when deposition within the channel would be 120,000 to 350,000 cy. Historically, an average of about 200,000 cy of material have been removed during cleanouts. The riffles and pools that develop in the stream bed between flood events would be covered by sediment during floods; after flood events, periodic future sediment removal would clean the channel to the 1977 invert. Over time, the riffles and pools that provide aquatic habitat would reestablish in the channel. The project would consist of sediment from within the existing fish ladder tapering off into a pilot channel 600 meters (1969 ft) downstream of Highway 126 at the confluence of the Santa Clara River. The amount of material to be excavated is ~255,000 cm (333,500 cubic yards) which includes the sediment in between the existing fish ladder at the north end of the project to the confluence of the Santa Clara River. The amounts being excavated vary between stations.

Contact Information

Name
Randy Tabije
Agency Name
U.S. Army Corps. Of Engineers
Contact Types
Lead/Public Agency

Location

Cities
Santa Paula
Counties
Ventura
Cross Streets
Highway 126 and Telegraph
Zip
93060
State Highways
126
Railways
SPRR
Airports
Santa Paula
Schools
Mupu ES
Waterways
Santa Paula Creek

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Caltrans, Division of Aeronautics, Department of Toxic Substances Control, Department of Water Resources, Office of Emergency Services, California, Office of Historic Preservation, Resources Agency, Resources, Recycling and Recovery
Development Types
Other (Sediment Removal for Flood Protection)
Local Actions
Use Permit
Project Issues
Air Quality, Cultural Resources, Economics/Jobs, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Schools/Universities, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print