Sand Mound Slough Outfall Reconstruction

7 Documents in Project

Summary

SCH Number
1992023048
Lead Agency
Contra Costa County
Document Title
Sand Mound Slough Outfall Reconstruction
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2007
Document Description
The proposed project is the replacement of two existing storm water pump stations and discharge pipes along Sand Mound Slough located in Oakley, Contra Costa County. The project proposes to reconstruct and upgrade existing Pump Station 3 (PS3) and Pump Station 4 (PS4) which currently removes levee seepage and storm water from the Summer Lakes Development and surrounding existing agricultural and residential areas. The two pump stations will be constructed as 2-story buildings with all control panels, generator, and generator fuel tanks on the second floor above the 100-year flood elevation. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2007-0212-3 pursuant to Section 1602 of the Fish and Game Code to the project operator, Robert Wainwright, Shea Homes Limited Partnership.

Contact Information

Name
Anna Holmes
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Oakley
Counties
Contra Costa
Cross Streets
CTPRESS RD & BETHEL ISLAND RD
Parcel #
*1
State Highways
4
Waterways
DELTA AREA
Township
T2N
Range
R3E
Section
*2
Base
MDBM

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print