Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for Yolo County General Landfill in Yolo County, SWIS No. 57-AA-0001

8 Documents in Project

Summary

SCH Number
1991073040
Lead Agency
Yolo County
Document Title
Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for Yolo County General Landfill in Yolo County, SWIS No. 57-AA-0001
Document Type
NOD - Notice of Determination
Received

Document Description
An increase in the permitted design capacity for compostable material handling from 45,000 cubic yards to 369,000 cubic yards. An increase in the permitted acreage for compostable material handling from 5 acres to 59 acres. Addition of two separate composting activities: Composting Facility #1, which is a two-stage anaerobic/aerobic batch composting process; and Composting Facility #2, which is a covered aerated static pile composting process. Addition of an In-Vessel Digestion system with a permitted area of 2.3 acres and a design capacity of 3,360,000 gallons. Updates to the Joint Technical Document including: Incorporation of a Report of Composting Site Information for Composting Facility #1, incorporation of a Report of Composting Site Information for Composting Facility #2, incorporation of an In-Vessel Digestion Report, and updates to figures and appendices.

Contact Information
Alyssa Gagnon
CalRecycle
PO Box 4025
Sacramento, CA 95812-4025

916-341-6066

Location

Cities
Davis
Counties
Yolo
Cross Streets
Roads 28H and 104
Total Acres
~725
Parcel #
042-0140-001, -002, -006
Waterways
Willow Slough Bypass
Township
9N
Range
3E
Section
29,30
Base
MDB&M

Notice of Determination

Approving Agency
Cal Recycle
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1001 I St., PO Box 4025, Sacramento, CA 95812-4025

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search