Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for Yolo County General Landfill in Yolo County, SWIS No. 57-AA-0001

9 Documents in Project

Summary

SCH Number
1991073040
Lead Agency
Yolo County
Document Title
Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for Yolo County General Landfill in Yolo County, SWIS No. 57-AA-0001
Document Type
NOD - Notice of Determination
Received
Posted
8/3/2018
Present Land Use
Yolo County General Plan Designation: Yolo County Zoning: A-1 (Agriculture)
Document Description
An increase in the permitted design capacity for compostable material handling from 45,000 cubic yards to 369,000 cubic yards. An increase in the permitted acreage for compostable material handling from 5 acres to 59 acres. Addition of two separate composting activities: Composting Facility #1, which is a two-stage anaerobic/aerobic batch composting process; and Composting Facility #2, which is a covered aerated static pile composting process. Addition of an In-Vessel Digestion system with a permitted area of 2.3 acres and a design capacity of 3,360,000 gallons. Updates to the Joint Technical Document including: Incorporation of a Report of Composting Site Information for Composting Facility #1, incorporation of a Report of Composting Site Information for Composting Facility #2, incorporation of an In-Vessel Digestion Report, and updates to figures and appendices.

Contact Information

Name
Alyssa Gagnon
Agency Name
CalRecycle
Contact Types
Lead/Public Agency

Location

Cities
Davis
Counties
Yolo
Cross Streets
Roads 28H and 104
Total Acres
~725
Parcel #
042-0140-001, -002, -006
Waterways
Willow Slough Bypass
Township
9N
Range
3E
Section
29,30
Base
MDB&M

Notice of Determination

Approving Agency
Cal Recycle
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print