Roseville Galleria Bridges Project
8 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 1988053010
- Lead Agency
- City of Roseville
- Document Title
- Roseville Galleria Bridges Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/12/2012
- Document Description
- The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2010-0043-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, City of Roseville. The project is limited to construction of a bike and walking trail bridge crossing over an unnamed tributary of Pleasant Grove Creek in order to connect the existing bike trail along the creek. The creek will be temporarily diverted around the construction site. Upstream and downstream check dams will be installed and the impounded water pumped through pipes through the construction site. Concrete abutments will be installed for the bridge and riprap will be placed around the base of each abutment to protect against undermining and erosion of the bank around the abutments during times of high creek flow. Construction will take place when stream flows are at the lowest. It is believed that only one willow tree may need to be removed. All other impacts are anticipated to be temporary in nature. An area appropriate native grass seed mix will be hydroseeded over the disturbed areas following completion of all construction activities.
- Contact Information
-
Garry O. Kelley
Department of Fish and Game
Lead/Public Agency
Sacramento Valley and Sierra Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670
Phone : (916) 358-2879
Location
- Cities
- Roseville
- Counties
- Placer
- Total Acres
- 2,371
- State Highways
- 80
- Railways
- SPRR
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- City of Roseville Planning Department, 311 Vernon Street, Roseville, CA 95678
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.