Roseville Galleria Bridges Project
8 Documents in Project
Summary
SCH Number
1988053010
Lead Agency
City of Roseville
Document Title
Roseville Galleria Bridges Project
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2012
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2010-0043-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, City of Roseville.
The project is limited to construction of a bike and walking trail bridge crossing over an unnamed tributary of Pleasant Grove Creek in order to connect the existing bike trail along the creek. The creek will be temporarily diverted around the construction site. Upstream and downstream check dams will be installed and the impounded water pumped through pipes through the construction site. Concrete abutments will be installed for the bridge and riprap will be placed around the base of each abutment to protect against undermining and erosion of the bank around the abutments during times of high creek flow. Construction will take place when stream flows are at the lowest. It is believed that only one willow tree may need to be removed. All other impacts are anticipated to be temporary in nature. An area appropriate native grass seed mix will be hydroseeded over the disturbed areas following completion of all construction activities.
Contact Information
Name
Garry O. Kelley
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Roseville
Counties
Placer
Total Acres
2,371
State Highways
80
Railways
SPRR
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.