Pajaro River Community Access, Recreation, and Education (CARE) Project

3 Documents in Project

Summary

SCH Number
2008082109
Lead Agency
City of Watsonville
Document Title
Pajaro River Community Access, Recreation, and Education (CARE) Project
Document Type
NOD - Notice of Determination
Received
Posted
9/27/2009
Document Description
The City of Watsonville is proposing to develop a parking lot and trail system to a publice small personal watercraft (kayak/canoe) pun-in on the Pajaro River adjacent to the existing Watsonville Wastewater treatment facility located off Beach Road, west of Watsonville. The project would consist of constructing a trailhead parking lot and restroom facilities adjacent to the new recycled water treatment facility and operations/office building currently under construction immediately east of the wastewater treatment facility. The driveway and parking lot for the trailhead and operations center would be paved in pervious paving. Portable handicap-accessible restrooms, a drinking fountain and an interpretive kiosk would be located adjacent to the turnaround at the south end of the parking lot. The parking lot would be landscaped with a drought-resistant demonstration garden and native trees. The 8 ft wide trail would begin at the parking lot turnaround and ascend 220 ft to the top of the levee where it would connect to an existing levee trail. An outlook platform would be located on the opposite side of the levee trail and paved with permeable decomposed granite.

Contact Information

Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Watsonville
Counties
Santa Cruz
Cross Streets
401 Panabaker Lane
Zip
95076
Total Acres
0.236
Parcel #
APN-52-071-13
Waterways
Pajaro River
Township
11S
Range
1E

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print