SCH Number 2025050928
Project Info
- Title
- Eastside Bypass Flood Reduction Project
- Description
- The proposed Project consists of purchasing and installing ten (10) temporary ?sh screens in the Eastside Bypass Canal to divert floodwater to the existing recharge areas. The proposed ?sh screens are 24" in diameter and 48" long.
1 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOE | Clayton Water District | Eastside Bypass Flood Reduction Project |