SCH Number 2025040203


Project Info

Title
Westside Subbasin Ephemeral Creeks Recharge Projects
Description
The Project would entail (1) the construction and operation of new surface water diversion and groundwater recharge basins and facilities located along Arroyo Pasajero Creek and Panoche Creek, and (2) the conversion and operation of the existing Cantua Creek storage basin to a surface water diversion system and recharge basin facility. The proposed basins would provide a combined percolation area of 1,004.95 acres, up to a maximum of 1,485.3 acres. The District proposes to divert up to a total maximum of 24,260 acre-feet per year (AFY) of surface waters from these three ephemeral drainages during periods of high flow to be retained in three (3) proposed diversion and recharge basin locations. The purpose of the Project is to provide facilities to capture excess surface water supply to be more efficiently recharged to the underlying groundwater basin, improving water supply reliability within the region, and improving conditions of the underlying aquifer consistent with the District GSP. In addition, some of the other goals of the Project are to protect baseline replenishment and existing beneficial uses while appropriating flood waters, enhancing natural aquifer recharge, promoting groundwater sustainability in the Subbasin, and providing flood relief to landowners adjacent to the proposed Project facilities. More efficient and reliable groundwater recharge would reduce adverse effects related to groundwater pumping, and support agricultural operation throughout the region. Recharging excess surface water during normal and wet hydrological years would also aid in lessening the effect of dry years and drought periods.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Westlands Water District Westside Subbasin Ephemeral Creeks Recharge Projects - NOD
Westlands Water District Westside Subbasin Ephemeral Creeks Recharge Projects