SCH Number 2025020912


Project Info

Title
Polytechnic High School Transformation Project
Description
The Proposed Project includes development of new Buildings and and an aquatic center, campus-wide improvements, and demolition of eight buildings including buildings 150, 550, 700, 750, 800, 850, 950, and the Gymnasium. The Proposed Project would be constructed over two phases. The first phase (summer 2025 through winter 2027) will see the construction of a three-story classroom building, along with HVAC and technology modernization in seven existing buildings. The second phase (winter 2027 through summer 2030) will see the demolition of seven existing buildings, the construction of a new drama/band building (building 150), a three-story classroom building (building 1000), a two-story gymnasium building (building 800), an aquatic center with a pool and support facilities (Building 850), a two-story administration/classroom/wellness building (building 700), a new baseball field and student pick up and drop off along Jack Rabbit Lane. Scope of improvements include, but is not limited to: HVAC system installation; ADA – accessibility upgrades; restroom upgrades; Fire Alarm upgrades; ceiling mounted overhead projectors; marker boards and tack boards; ceiling repair; interior lights; interior and exterior painting; new finishes; windows replacements or repairs and window shades; and, signage (campus-wide).
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Long Beach Unified School District Polytechnic High School Transformation Project
Long Beach Unified School District Polytechnic High School Transformation Project