SCH Number 2024120432
Project Info
- Title
- Kerman High School Athletic Facilities Master Plan Expansion
- Description
- Project Description: Proposed improvements within the expansion area would include a covered parking lot with solar panels; a battery storage/utility building; a maintenance, operations, and transportation (MOT) facility; a food service building; an office and printshop; and a stormwater basin. These improvements would have an approximate footprint of 51,100 square feet. The limits of the expansion area extend to the centerline of North Del Norte Avenue and SR 180, to address required future street and frontage improvements that could include new curb and gutter, added acceleration/deceleration lanes on SR 180, and installation of street signage and pavement improvements. Details of these improvements would be determined at time of project construction when submitting for building permits. The expansion area also accommodates the proposed internal access road and roundabout running between SR 145 and North Del Norte Avenue at the north edge of the site. Improvements to the 2016 Project site (proposed as part of the 2024 Project) include a storage facility, gymnasium, entry booths to the soccer/football stadium, two restroom facilities, two snack bars, grandstand seating for the soccer/football stadium, and three buildings to support the aquatics facilities (one building with restrooms/showers, one building with a snack bar, coaches offices, and team room, and one building with pool chemical and equipment storage). These improvements would have an approximate footprint of 56,900 square feet and a maximum height of 50 feet.
2 documents in project