Arsenic Exceedance-Remediation
Description
The Proposed Project would involve drilling a new well near the existing Well No. 2, destruction of the existing Well No. 2 and construction of an arsenic treatment facility with a footprint of approximately 30 feet x 30 feet with solar power panels installed on the building’s roof. Approximately 300 feet of 6-inch polyvinyl chloride transmission pipeline will be installed to deliver water from the proposed well to the treatment building. The Project would replace Well No. 1 pump and motor, underground the onsite electrical lines, install new electrical panels, and remove the structure covering the existing electrical equipment. Four aging tanks will be removed and replaced with two new 146,500-gallon bolted steel tanks.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
State Water Resources Control Board, Divison of Financial Assistance Arsenic Exceedance-Remediation
State Water Resources Control Board, Divison of Financial Assistance Arsenic Exceedance-Remediation
State Water Resources Control Board, Divison of Financial Assistance Arsenic Exceedance-Remediation