SCH Number 2024100477


Project Info

Title
Cameron Creek Linear Recharge Project
Description
The proposed Project proposes to construct up to three (3) reinforced concrete check structure facilities within the Cameron Creek channel. All check structures would be equipped with control gates and weir boards capable of passing high flows (250 cubic feet per second) while maintaining high water levels in the channel making Cameron Creek a linear recharge basin. The section of the Cameron Creek to be utilized begins near the start of Cameron Creek where it diverts from TID’s Main Intake Canal east of Road 156, with the end location northeast of the Lovers Lane and Caldwell Avenue intersection. For each check structure, it is anticipated that excavation through the creek channel and embankment would reach approximately 65 feet horizontally at a depth of about 10 feet from channel top (excavation from channel bottom will likely only 3-4 feet). Excavation for construction will be minimal and would only be the amount necessary for constructing the structures. Once completed, excavated soil would be backfilled around the structure and the channel prism re-graded to match existing conditions. No material export is anticipated, and earthwork would be balanced on site. The Area of Potential Effect contains a total of 14 acres. This includes the proposed Project construction areas and an additional 25-foot buffer surrounding the proposed Project site.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Visalia Cameron Creek Linear Recharge Project
City of Visalia Cameron Creek Linear Recharge Project