SCH Number 2024090486
Project Info
- Title
- Wastewater Plant Consolidation Project
- Description
- The proposed project would enable the transfer of wastewater treatment services to the Northwest Wastewater Treatment Plant (WWTP) and cease all operations at the Beach WWTP. The project would include new force mains between 3” and 14” from the Beach WWTP to the Northwest WWTP and four lift stations (two new and two improved). The lift stations would pump wastewater through the new force mains to the Northwest WWTP. Additional treatment and process improvements would be made at the Northwest WWTP to add to the efficiencies of the existing process. Improvements would be made, to the extent feasible, to existing wastewater lines within existing roadways and previously disturbed right-of-way, urbanized areas, and to minimize alterations to undeveloped areas. The proposed project is needed to enable the City to improve and rehabilitate the existing wastewater service capacities and protect water quality and beneficial uses of the Sacramento River. The project is intended to enable transfer of service from the Beach WWTP and would not increase the overall capacity beyond what was previous planned.
2 documents in project