SCH Number 2024081408
Project Info
- Title
- Good Hope-Olive Storm Drain Stages 1 and 2
- Description
- The Good Hope–Olive Avenue Storm Drain Stages 1 and 2 Project (Project) consists of the construction of various storm drain infrastructure, including but not limited to reinforced concrete pipe, basin, several inlet structures and appurtenances, outlet structure, and riprap energy dissipators. Collectively, these improvements will safely convey stormwater flows to the existing box culvert located near the intersection of SR-74 and Theda Street, thereby minimizing significant surface drainage from meandering through existing residential properties during large storm events. The project also proposes road improvements along limited sections of unpaved roadway within Read Street, Mountain Avenue, and Steele Peak Avenue.
2 documents in project