SCH Number 2024080915
Project Info
- Title
- East Valley Water District Well No. 129 Project
- Description
- The District seeks to install a new well, which would aid the District in meeting current and future demand. Well No. 129 is proposed to be located within a less than one acre portion of an approximately 2.37-acre parcel (Assessor’s Parcel Numbers [APN] 121038110) a site northwest of the intersection of Calle Del Rio Street and Vista Clara Street, south of Oak Creek in the City of Highland. The District owns APN 121038110, which presently contains two 3-million gallon steel water storage reservoirs. The site is referred to as EVWD Plant No. 129. The site would include the following features: the new well (wellhead); an 8” diameter pipeline connecting to the District’s existing piping onsite; a 4’ diameter reinforced concrete pipe that extends 2’ above grade and 16” RCP drain line; chlorine and orthophosphate dosing systems; a 55’ x 20’ Concrete Masonry Unit block building with a standing seam metal roof enclosing the wellhead, discharge header, PTW header, electrical equipment, and chemical facilities. The District anticipates that the new well will be drilled utilizing the reverse circulation rotary drilling method to about 550 feet below ground surface, based on the depth of the District’s nearby well. The objective for the well is to generate 25 to 150 acre-feet of potable groundwater on a monthly basis.
2 documents in project