SCH Number 2024070049
Project Info
- Title
- ROWCO Reservoirs & Booster Replacement Project
- Description
- The Project consists of the installation and operation of a new 300,000-gallon welded steel, potable water storage reservoir that will replace the two existing 100,000-gallon bolted steel reservoirs, estimated to be 14 feet diameter and 20 feet height. The new 300,000-gallon steel tank that will be approximately 25 feet in height and 46-feet in diameter. The project site will be re-graded with no major change in the base elevation of about 6,298 feet amsl. About 40 cubic yards (CY) will be cut from the site and removed to a District storage location. Additionally, the portion of the existing access road located within the project site will be improved. The new welded steel tank will maintain about four feet of freeboard to protect the reservoir from sloshing impacts during an earthquake. The proposed foundation system will be a reinforced concrete ring wall foundation system. Maximum foundation loads are anticipated at 3,500 pounds per linear foot (plf) for continuous (ring wall) foundation and up to 80 kilo-pounds (kips) for isolated pad foundations are anticipated. Associated site improvements will consist of new inlet/outlet piping, overflow and drain piping, installing water level monitoring equipment, new site pavement improvements, block walls and/or chain-link fencing as needed to control potential trespass.
2 documents in project