SCH Number 2024051079
Project Info
- Title
- Vallejo Ferry Terminal Reconfiguration Project
- Description
- The proposed project would reconfigure the existing Vallejo Ferry Terminal on the eastern shore of the Mare Island Strait, within the footprint of the existing ferry terminal and basin area. The proposed terminal would remove and replace 5,322 sf of existing gangway, passenger float, and piles with a new reconfigured four-section fixed pier and gangway extending from the existing ferry terminal access point, passenger float, and piles. The new passenger float would be approximately 134.5 feet by 42 feet, run parallel with the flow of Mare Island Strait, and accommodate two vessels at a time for passenger loading and unloading. The proposed project would facilitate a reduction in the need for regular dredging maintenance at the Vallejo Ferry Terminal.
2 documents in project