SCH Number 2024040605
Project Info
- Title
- Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project (WTL019)
- Description
- Development of the proposed Project would include two segments (0.94 mile) of new asphalt trail (Class I Bikeway) with decomposed granite shoulders, new sidewalks, signs, striping, and pavement markings. A trail extension is proposed along the northern side of Big Horn Boulevard between the Trojan Storage II Project west of Lewis Stein Road and Bruceville Road (approximately 0.16 mile). This trail segment would cross at-grade with Bruceville Road at an existing signal-controlled crosswalk. Additional trail gap closures between Bruceville Road, Mannington Street, and Center Parkway would complete connections to existing trails that extend further north and west into the City of Sacramento, thereby linking thousands of residents to an interconnected trail system between two cities and multiple neighborhoods. Sidewalk improvements would be constructed along Bruceville Road between Big Horn Boulevard and Center Parkway (approximately 0.3 mile) and between Laguna Boulevard and Di Lusso Drive (approximately 0.04 mile).
2 documents in project