SCH Number 2024031191
Project Info
- Title
- Foothill Drive Bike Connection and Safety Improvements
- Description
- The Project will pulverize approximately 1,150 linear feet of the existing, County owned, 24-foot-wide asphalt road from 100 feet east of the bridge at Encinosa Creek, to the Vacaville City limit, and construct a 32-foot-wide paved roadway on a new alignment for safety purposes. Site amenities will include, asphalt paved driveway connections, sign relocations, roadside ditch installation, addition of bike lanes, construction of one block retaining wall, on-site mitigation for tree removal, and slope stabilization using hydroseed, straw and jute mesh. Three existing corrugated metal pipe (CMP) driveway culverts will be removed, and new CMP culverts installed to fit with the new contoured alignment. The County of Solano is in the process of obtaining Right-of-Way (ROW) from the City of Vacaville up to the edge of roadway embankment construction. The new roadway alignment will only cross the south-west corner of the existing parcel (APN 0125-060-090).
2 documents in project