SCH Number 2024020266


Project Info

Title
Lancaster Clean Energy Center (Conditional Use Permit No 23-019)
Description
The applicant (Element New Energy Lancaster 1, LLC) proposes to construct and operate the Lancaster Clean Energy Center, a green hydrogen production plant powered by photovoltaic (PV) solar. This facility is self-sufficient, integrated and off-grid and consists of a 650 megawatt PV solar generating facility; 330 MWh battery long duration energy storage system; and a green hydrogen production plant incorporating 400 MWe of electrolyzers, liquefied hydrogen storage in up to two horizontal cylindrical tanks with a capacity of 30 metric tons each, and up to three 100 mt spherical liquefied hydrogen tanks. Onsite gaseous hydrogen storage consists of approximately 30 metric tons in a linear surface pipe storage arrangement. All hydrogen production would be located along 70th Street East Access to the hydrogen production plant would be from driveway(s) on 70th Street East, north of Avenue K. Access to the solar fields would be provided from several driveways from Avenue K and potentially from 40th Street East, Avenue K-8, and 50th Street East depending upon the solar array arrangements and Fire Department requirements.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Lancaster Lancaster Clean Energy Center (Conditional Use Permit No. 23-019)
City of Lancaster Lancaster Clean Energy Center (Conditional Use Permit No 23-019)