- Holtville Peaker Battery Energy Storage System
- Description
- The project applicant has applied for a conditional use permit to allow for the construction and operation of a 100-megawatt battery energy storage system (BESS) (i.e., peaker plant). The project would include development of a BESS facility that would connect to the existing Imperial Irrigation District’s 92-kilovolt “E” Line. The BESS facility would include battery containers and storage sites, a control room, on-site substation, and associated facilities surrounded by fencing in the south-central portion of the parcel, with the remainder of the parcel used for temporary construction access and staging.