SCH Number 2023110294
Project Info
- Title
- Upper Wildwood Creek Basin Groundwater Recharge and Water Management Project
- Description
- The City of Yucaipa (City) proposes the construction of a multipurpose flood control basin within the existing Wildwood Creek. The basin is proposed to be a flow-through basin with a capacity of approximately 25 acre-feet (Project).
2 documents in project