SCH Number 2023090352
Project Info
- Title
- Morningstar Village Project
- Description
- The project involves construction of an approximate 3,593 square foot (sf) 12 pump fuel station, a 6,100-sf convenience store with a 1,000-sf restaurant and seating area, and a two-stall outdoor dog wash all located on the western side of the project site, as well as a 4,800-sf rapid pass car wash with 20 car vacuum stalls on the eastern portion of the site. The car wash building would have areas for an office, a breakroom, and restrooms, as well as spaces for storage and car wash and vacuum equipment. The gas station component of the project would include six pumping stations with two pumps at each station, a 10,000-gallon underground storage tank (UST) for diesel fuel, a 20,000-gallon unleaded UST, a 12,000-gallon premium gasoline UST, and a 1,000-gallon propane aboveground storage tank (AST) to serve a propane filling station.
2 documents in project