SCH Number 2023080369
Project Info
- Title
- El Camino Project
- Description
- The El Camino Project (Project) is a proposed two-phased project proposing development/redevelopment of an approximately 30.11-acre site to expand the existing operations of an existing beverage distribution facility to allow for the production, bottling and distribution of beverage products. The existing Project site is currently developed with a total of 208,575 square feet of buildings. The Project proposes to demolish approximately 175,685 square feet of buildings as part of Phase 1 and construct approximately 992,331 square feet (including reusing an existing office building). Phase 2 includes two options which would consist of either tenant improvements to an existing 62,210 square foot building or demolition of the existing building and construction of a new building totaling approximately 40,065 square feet. Eventually the Project could occupy and operate a total of up to approximately 1,054,541 square feet of buildings after both phases of construction are complete (assuming Option 1 is chosen). The Project will also include the drilling and development of a groundwater supply well in the southeastern corner of the Project site. As a component of the well construction, the Project would be required to construct a water transmission line of approximately 2,700 linear feet of 12-inch cement mortar lines and coated pipe. The applicant is coordinating with Cucamonga Valley Water District (CVWD) to secure all necessary permits and entitlements for the water well and related facilities. In addition to the currently planned infrastructure improvements, the Project, as part of Phase 2, would construct a combined heat and power or cogeneration facility on the eastern part of one of the proposed industrial building.
2 documents in project