SCH Number 2023070241
Project Info
- Title
- DJT4 Parcel Delivery Facility Project
- Description
- The DJT4 Parcel Delivery Facility Project would demolish the existing 637,503-square-foot office building and surface parking lot to construct a 181,500-square-foot parcel delivery facility, consisting of 163,350 square feet of warehouse and storage space and 18,150 square feet of ancillary office space, on an approximate 31.6-acre site. The proposed facility would be a single-story building with a maximum height of 56 feet (including architectural projects) and floor area ratio of approximately 0.14:1. The Project would provide 1,065 vehicle parking spaces (consisting of 304 automobile spaces, 757 delivery van spaces, four line-haul truck trailer spaces), 180 ancillary van loading spaces (90 loading spaces, 90 staging spaces), and 13 Utility Tractor Rig loading spaces to support facility operations. The proposed facility would be generally located in the center of the Project Site and flanked by loading areas and surrounded by vehicle parking. The Project building would be located entirely within the Light Industrial (M-1) zone, and surface parking and drive aisles would be located within the Light Industrial (M-1) and Mixed-Use II (MU-II) zoned portion of the Project Site. The following permits and approvals are proposed for the Project implementation: - Pursuant to BCC Section 20.408.040, Plan Review No. 2022-09 for a new construction project in the M-1 and MU-II zones. - Pursuant to BCC Section 18.36, Vesting Tentative Parcel Map No. 2022-193 for a proposed merger and subdivision on the Project Site. - Other discretionary and ministerial permits and approvals that may be deemed necessary, including, but not limited to, temporary street closure permits, grading permits, excavation permits, foundation permits, building permits, sign permits, and tree removal permits.
2 documents in project