SCH Number 2023060210


Project Info

Title
Atwood Multipurpose Trail Project
Description
The proposed project would be an approximately 20-foot-wide trail alongside the Atwood Channel right-of-way. The trail would include a paved multiuse path; midblock crossings with ADA accessibility including modified sidewalks and curb ramps; access gates; a trailhead at Parque de Los Niños; new street signs; path striping and wayfinding signage; and landscaping along selected shoulders or best management practices adjacent to the path. Mid-block crossing options are identified and would be included at the mentioned bisected streets or intersections for providing residents with connection to residential areas and parks. Existing trail slope/grades would be maintained where possible. The proposed project would include the construction of a 1.0-mile-long segment multiuse trail stretching from the BNSF/Metrolink rail line tracks to Lakeview Avenue to expand the City’s bikeway network and enhance pedestrian and biking connectivity. A 0.1-mile-long segment from Jefferson Street to the BNSF/Metrolink railroad tracks that includes a trail extension and a bridge over the BNSF/railroad tracks is under consideration as "Optional to Be Determined" by the City and Caltrans.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Placentia Atwood Multipurpose Trail Project
City of Placentia Atwood Multipurpose Trail Project