SCH Number 2023050251


Project Info

Title
749 West El Camino Real Mixed-Use Project
Description
The project would demolish the existing 1,487 square foot restaurant building, 18,302 square foot bank building, and all associated surface parking and landscaping on-site to construct two new buildings on-site: 1) a two-story (up to 41 feet tall), up to 11,500 square foot bank and 2) a six-story (up to 75 feet to the top of the roof and up to 86 feet up to the top of the canopy), mixed-use building with 299 multi-family residential units (33 of which would be reserved for low- to very-low- income households), up to 13,465 square feet of ground-floor commercial uses, and two levels of underground parking. The mixed use-building would contain one level of ground floor podium parking and two levels of underground parking. The commercial square footage would be located adjacent to El Camino Real on the northern portion of the project site. The new bank would be located on the northwest corner of the project site and a public plaza is proposed on El Camino Real between the proposed bank building and mixed-use building’s ground-floor commercial uses. The project would preserve the existing artwork pieces associated with the existing bank building and plaza and incorporate them into the project design. Implementation of the project would require the removal of existing trees, including Heritage Trees. The proposed project would plant replacement trees in conformance with the City requirements. The project also includes utility and right-of-way improvements. The project would meet Tier 2 development standards per the El Camino Real Precise Plan and have a maximum structure height of up to 75 feet and a floor-area-ratio (FAR) of approximately 3.04 (98 dwelling units per acre [du/ac]). The project would utilize the State Density Bonus Law to exceed the allowed zoning density of 2.3 FAR with a 43.1 percent density bonus as calculated based on Mountain View’s Density Bonus Program Guidelines and Municipal Code Section 36.48.75; therefore, the project would not require a General Plan amendment or rezoning. Pursuant to State Density Bonus Law and the City’s Density Bonus Program Guidelines, the project is eligible for concession and waivers.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Mountain View 749 West El Camino Real Mixed-Use Project
City of Mountain View 749 West El Camino Real Mixed-Use Project