SCH Number 2023050009


Project Info

Title
Bracken Brae and Forest Springs Consolidation Project
Description
The purpose of the Bracken Brae and Forest Springs Consolidation Project (proposed project) is to consolidate and incorporate two small mutual water companies, Bracken Brae and Forest Springs, into the SLVWD system. The proposed project includes the following actions: installation of 8,960 linear feet of 10- and 12-inch diameter water main in the existing SLVWD right-of-way (ROW); installation of a new pump station in located within an easement on APN 082-03-118, located at the corner of Ridge Drive and Big Basin Highway; demolishing the two existing 17,500-gallon existing concrete block Forest Springs water storage tanks (37,000 gallons total capacity) and four 10,000-gallon (40,000 gallons total capacity) Bracken Brae temporary water storage tanks; and installation of one or two water storage tanks (total 120,000-gallon capacity) at the existing Forest Springs water storage tank site.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
San Lorenzo Valley Water District Bracken Brae and Forest Springs Consolidation Project
San Lorenzo Valley Water District Bracken Brae and Forest Springs Consolidation Project