SCH Number 2023030248


Project Info

Title
Colovore Data Center
Description
The project would make changes to the existing industrial building on the site including: seismic upgrades to the building, upsizing the power supply from 1.6 megawatt (MW) to 9 MW (provided by two new 4.5 MW feeds from SVP), installation of five 2,000-kilowatt (kW) back-up generators (each would include an associated 4,000-gallon above ground diesel tank), and installation of five 427-ton free cooling chillers. No new SVP substations would be required or constructed as part of this upsizing. Additional site improvements would include upgrades to existing hardscape, parking areas, and landscaping, to improve appearance and meet applicable ADA standards. Sidewalks would be added along Raymond Street to the north and east to facilitate pedestrian access to the project site. A new connection to the existing recycled water line that runs along Raymond Street to the east of the project site would be added on the south side of the building.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Santa Clara 3060 Raymond Street Data Center Project
City of Santa Clara Colovore Data Center