SCH Number 2022040058


Project Info

Title
Freedom Bridge Removal Project
Description
The Freedom Bridge Removal Project (Project) involves removal of an existing pedestrian bridge across San Tomas Aquino Creek and associated structures. Valley Water and Intel’s lease agreement was extended to October 2022 to allow Intel to remove the Freedom Bridge. Project implementation has been divided into two phases: Phase I, which includes the removal of the existing bridge structure and Phase II, which includes the removal of bridge abutments and associated re-grading and re-paving of the San Tomas Aquino Creek Trail and the Valley Water levee maintenance road in the vicinity of the abutments. The Freedom Bridge is an approximately 125-foot long steel beam span bridge resting on concrete abutments built on constructed levee slopes. The paved San Tomas Aquino Creek Trail is located on the western side of the bridge, and a Valley Water levee maintenance road is located on the eastern side.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Santa Clara Valley Water District Freedom Bridge Removal Project
Santa Clara Valley Water District Freedom Bridge Removal Project