SCH Number 2022030296


Project Info

Title
Judson Transmission Main
Description
The Judson Transmission Main Project involves construction and operation of approximately 6,700 linear feet of 18-inch diameter steel or PVC potable water transmission pipeline with interconnections and appurtenances within Perris Boulevard, from the intersection with Robin Lane in the south to the Casey Court Tank Access Road, about 550 feet south of the intersection with Heacock Street, in the north. The Project would connect to existing 18-inch pipelines at Robin Lane and Casey Court Storage Tank access road along with interconnections to the distribution system along the route. The Project would improve operational efficiency of EMWD’s potable water distribution system between existing Casey Court Storage Tank and North Country Tank in the north and the future Judson Tank in the south by balancing tank levels through increased transmission main capacity. Another purpose of the Project is to improve operational redundancy in EMWD’s potable water system, specifically the Moreno Valley 2060 Pressure zone.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Eastern Municipal Water District (EMWD) Judson Transmission Main
Eastern Municipal Water District (EMWD) Judson Transmission Main