SCH Number 2022010383


Project Info

Title
City of Fullerton Main Plant PFAS Water Treatment Plant
Description
The Project consists of the installation of a small treatment plant at an existing groundwater production well site for the treatment of PFAS contaminants. The PFAS treatment plant and associated on-site conveyance piping has been sized to treat a Well 3A discharge flow of 2,785 gallons per minute (gpm) and a Well 5 discharge flow of 1,700 gpm. Ten granular activated carbon (GAC) vessels will be installed to treat the water produced from. The site’s frontage to La Palma Avenue will be improved with a block wall and new landscaping to screen views onto the site. The proposed Project would occur within areas that were previously disturbed by well and pipeline installations at the site.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
State Water Resources Control Board City of Fullerton Main Plant PFAS Water Treatment Plant
Orange County Water District City of Fullerton Main Plant PFAS Water Treatment Plant