SCH Number 2021120497
Project Info
- Title
- First March Logistics Project
- Description
- The Project consists of two industrial buildings totaling 544,375 square feet (sq. ft.). Building 1 (Phase 1) consists of a 419,034 sq. ft. industrial building with 411,034 sq. ft. of warehouse and 8,000 sf of office; Building 2 (Phase 2) consists of a 125,341 sq. ft. industrial building with 118,341 sq. ft. of warehouse and 7,000 sq. ft. of office are. The buildings would allow for either high-cube, non-refrigerated warehouse/distribution, or manufacturing uses. The Project will be constructed in two phases: 1) Building 1 on 20.0 acres and a detention basin on 6.4 acres (between Natwar Lane and Western Way), and 2) Building 2 would replace the detention basin by 2025.
3 documents in project