SCH Number 2021120441
Project Info
- Title
- Murrieta Creek Multi-Use Trail
- Description
- The proposed project entails construction of a regional multi-use trail (trail) that would extend in a northwest-southeast alignment between Skylark Drive and Stoneman Street adjacent to, and north of an existing residential neighborhood. At Stoneman Street, the trail would turn to the northeast and continue along the undeveloped road right-of-way for approximately 1,300 feet and then turn to the northwest within the undeveloped road right-of-way of future Como Street for approximately 1,300 feet. From there, the trail would turn to the southwest for approximately 1,000 feet and then approximately 750 feet to the west where it would connect with the existing Levee Trail. The proposed trail would be ten feet wide with two-foot-wide shoulders on each side of the trail. Wood post fencing would be installed on both sides of the trail. Arizona crossings, a span bridge, and a pipe culvert replacement and extension are proposed to cross existing ephemeral drainage features that intercept the trail. In addition, bollards, signage, and trash receptacles are also planned at public access points located at the Levee Trail connection, Stoneman Street, and Skylark Drive.
2 documents in project