SCH Number 2021120427


Project Info

Title
Interstate 15 Rehabilitate Existing Mainline and Ramp Pavement
Description
The proposed project consists of resurfacing, restoration, and rehabilitation (3R) in both directions on the highway, it is proposed to replace existing AC traveled ways and shoulders with Jointed Plain Concrete Pavement (JPCP). Purpose: To restore the structural integrity and ride quality of mainline and ramp pavements by rehabilitating the existing Portland Cement Concrete (PCC) and Asphalt Concrete (AC) pavements as appropriate. The proposed pavement rehabilitation strategies will reduce maintenance frequency and costs, improve ride quality, and increase the service life of the pavement. Need: The 2011 Pavement Condition Survey Inventory (PCS) data and the 2015 pavement condition report using Pavement Management (PaveM) tools indicate that the pavement within the project limits exhibits extensive cracking, faulting, and general poor ride quality.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
California Department of Transportation, District 8 (DOT) Interstate 15 Rehabilitate Existing Mainline and Ramp Pavement
California Department of Transportation, District 8 (DOT) Interstate 15 Rehabilitate Existing Mainline and Ramp Pavement