SCH Number 2021110022
Project Info
- Title
- Wheatland Regional Sewer Pipeline Project
- Description
- The primary goal of the proposed project is to construct the necessary pipelines and pump stations to successfully convey all current and future wastewater into a regional sewer system serving south Yuba County. The proposed pipeline would connect to OPUD’s force main (currently under design) near Rancho Road and State Route 65. OPUD would convey the flow to OPUD’s WWTP, where the flows would be treated to a tertiary level and discharged into a tributary to the Feather River. Additionally, three new pump stations would be constructed along the new pipeline to convey all projected flows to the OPUD point of connection and a new Public Works corporation yard would be constructed within the Pump Station 2 site. After construction of the pipeline and pump stations, it is anticipated that the City’s existing WWTP would be decommissioned, though the possibility exists for the WWTP to remain in operation for an interim period.
4 documents in project