SCH Number 2021080196
Project Info
- Title
- LAS CAMAS SOLAR PROJECT
- Description
- EDPR CA Solar Park III LLC (project applicant) proposes to develop, own, and operate a 200-megawatt (MW) alternating current (AC) ground-mounted solar photovoltaic (PV) power plant located on vacant lands in unincorporated Merced County. The goal of the proposed project is to provide renewable solar energy to be sold to a load serving entity through a power contract, generating electrical power from a clean source that would supplement the energy capacity of the existing power grid, thereby increasing the stability and operability of the transmission system, as well as offsetting supplies from fossil fuel generating sources. The applicant has filed applications for a Conditional Use Permit (CUP) (CUP Application No. CUP 20-011), General Plan Amendment (General Plan Amendment Application No. 20-001), and Zone Change (Zone Change Application No. ZC 21-002) with Merced County to allow for the construction, operation, and maintenance of the proposed project, which entails the long-term generation of clean renewable energy from solar power.
2 documents in project