SCH Number 2021070119
Project Info
- Title
- Feather River Boulevard Pipeline Project
- Description
- The Project is comprised of construction and operation of a new 10-inch diameter, ductile iron water pipeline proposed for placement in the roadway of Feather River Boulevard and use of a staging area on a vacant parcel (on Alicia Avenue north of Feather River Boulevard) during construction. The pipeline would extend 2,700 linear feet (LF) connect to existing Linda County Water District (LCWD) infrastructure, and be placed within the Yuba County right-of-way. The proposed Project would also include installation of (at minimum) 4 wet barrel fire hydrants. All work would conform with both LCWD and Yuba County standards.
2 documents in project