SCH Number 2021020258


Project Info

Title
Floradale Crossing Sewer Line Directional Drill
Description
The project proposes to install approximately 700 feet of inverted siphon interceptor sewer line using two 12-inch diameter High Density Polyethylene (HDPE) pipes and Horizontal Directional Drilling (HDD) trenchless technology boring under the Santa Ynez River. The second 12-inch pipe is intended to provide redundancy, stability and to allow for maintenance or repair.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Lompoc Floradale Crossing Sewer Line Directional Drill Project
City of Lompoc Floradale Crossing Sewer Line Directional Drill