SCH Number 2020120553
Project Info
- Title
- Central-Wheeler Tank and System Improvement Project
- Description
- Central-Wheeler Tank and System Improvements Project involves the construction, operation, and maintenance of an 0.8 Million Gallon (MG) welded-steel water tank and associated water drainage and transmission pipelines to improve reliability of water distribution within Authority’s Wheeler Pressure Zone, that will consist of the existing Wheeler Pressure Zone and a portion of the existing Gravity Pressure Zone.
2 documents in project