SCH Number 2020100366


Project Info

Title
Use Permit #2020-005, Initial Study #2020-001, Hooper
Description
Proposal to construct a 50-megawatt photovoltaic solar array and a battery energy storage system (BESS) that would store 25 megawatts or 100 megawatt hours of electricity, along with related infrastructure. Such infrastructure would include a substation, a dead-end tower up to 90 feet tall, 24 130-foot-tall steel gen-tie transmission line poles to interconnect with the Plumas-Sierra Rural Electric 120-kV transmission line approximately 3 miles south of the project site, access roads, and perimeter fencing. The project has an approximate footprint of 278 acres, not including the proposed gen-tie lines.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Lassen County Use Permit #2020-005, Initial Study #2020-001, Hooper
Lassen County Use Permit #2020-004, Initial Study #2020-001, Hooper