SCH Number 2020099020
Project Info
- Title
- Los Feliz Drive Sidewalks - Phase II
- Description
- The project includes new 5.5 to six-foot-wide sidewalks (with curb and gutter) on the west side of Conejo School Road between Thousand Oaks Boulevard and Los Feliz Drive. In addition, 5 to 5.5 foot-wide sidewalks with curb and gutter would be provided on the west side of Conejo School Road from near Beyer Park to near Hillcrest Drive. New six to 8-foot-wide sidewalks would be provided on the south side of Willow Lane from 750 feet east of Conejo Ridge Avenue to Fairview Road, and s ix foot-wide sidewalks provided on the north side of Willow Lane from near Fairview Road extending 400 feet to the west.
2 documents in project