SCH Number 2020060359
Project Info
- Title
- Beaumont High School Expansion
- Description
- Physical improvements would occur on the north half of the main campus. Demolition and Removal: Roundabout entry drive, portion of Parking Lot E and all of Lot D, Turf athletic fields, 8 basketball courts & 8 tennis courts. New Construction: Entry plaza and walkway along drop-off/pick-up zone, Lunch shelter, Two 25,000 sf 2-story classroom buildings with 42 classrooms and up to 1,344 seats—with open courtyard between buildings. Reconfigured Parking and Circulation: Lot E would be expanded to the south to provide an additional 225 spaces (total of 455 spaces). A new driveway along Cherry Valley Boulevard would provide a second access point for students and would relieve congestion at the main entry stop light. Lot D would be moved north and increased by 15 spaces (total of 199 spaces). Existing driveway on Cherry Valley Boulevard (2-lane entry, 3-lane exit) would be extended to provide significantly more stacking and a longer drop-off/pick-up zone; lane configuration would be the same. Reconfigured Play Fields and Courts: The fields and courts would be reconfigured for better access, space and supervision; Baseball and 2 softball practice fields, Running track, 2 soccer fields, 8 basketball courts and 8 tennis courts.
3 documents in project