SCH Number 2020019087
Project Info
- Title
- Locke Water System Intertie w/ SCWA
- Description
- The Project involves construction of a new drinking water transmission pipeline from the Locke community to the Walnut Grove community. The pipeline would be approximately 4, 150 feet in length and would extend from the Sacramento County Water Agency yard in Walnut Grove to a connection point in the Lock Water Works Company distribution system. A pump station will be installed at the Locke Water Works Company connection point. The existing Locke Water Works Company distribution system would continue to be used and the old well would be disconnected from the potable water system.
2 documents in project