SCH Number 2019129096


Project Info

Title
Construction of Fire Station Well No. 38
Description
The proposed project is the installation of a municipal groundwater production well for the purpose of drinking water supply. The City of Santa Clara has abandoned eight wells in the past, the new well installation will serve as replacement to augment the lost supply that was once provided by those abandoned wells. The proposed well will be drilled using reverse circulation drilling method , the final borehole will be 30-inches in diameter to a depth of 704 feet below ground surface. The submersible pump for the well will be housed in a pump station on a 10 foot by 10 foot concrete apron as required by the division of drinking water well standards.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Santa Clara Construction of Fire Station Well No. 38
City of Santa Clara Construction of Fire Station Well No. 38